Tests Completed Under Minimum Time Report

This report provides a list of tests that were completed under the minimum time set in the training properties. You can use this report to evaluate if employees, organization units, and/or groups are taking the appropriate time to complete the test. By default, the report displays all tests. You can run the report for a single test as needed.

PureSafety tab > Reports > Training > Tests Under Minimum Time

Tests Completed Under Minimum Time Report

The report includes the information below.
  • Organization unit the employee belongs to
  • Employee name
  • Test title
  • Date the test was completed
  • Time the employee spent taking the test*
  • Minimum time it takes to complete the training
  • Variance. This detail is the difference between the actual time the employee took to complete the test and the estimated minimum time.

Report Parameters

Tests Completed Under Minimum Time report parameters
Parameter Default Value Description
People None selected. Required. You can select multiple users, organization units, and groups.
Date Range Month To Date Required
Percent of Minimum Time 80% Required
Employee Status Active Required
Test None selected. All tests are included by default. Required

* "Time in training" data may be affected by user behavior such as the user closing the browser during a training session, a network interruption during a training session, the user allowing the session to remain idle for longer than the timeout period, the user placing the computer into hibernation mode during a training, and the user starting multiple, concurrent versions of the same training session.